Clients
Here the client was a subcontractor for Oldham Council. We were asked to face up a concrete retaining wall with stone and mortar to look like dry stone walling. this side was 3 to 4 metres deep and the roadside was 1.1 metres deep.
The finished section of roadside wall at 1.1 metres deep. We have subcontracted to face up other walls in the area in the same style, a 750 metre wall will take approximately four months to complete.
This client asked us to build a dry stone boundary wall after they had sold their surrounding land for building development. There was no stone available and there was no existing wall to rebuild. Stone was sourced from our own stock and a reliable supplier, The access was very restricted and we estimate approximately 120 tons of stone was moved around the site to where it was needed by wheelbarrow!!
This picture was taken at the end of the project, there was 130 metres of dry stone wall built.Including an internal garden wall and driveway entrance. Some stone was provided on site in huge blocks we were able to split these pieces into smaller boulders and using chisels and a sthil saw make the stone for the wall, (not recommended as it can be an expensive method). More pictures of this wall are here.
   





 
 
   
All Rights Reserved © Mark Doyle 2004